One firm. Three ways to help.

Design and build. Equipment, supplied and maintained. Advice you can take to a board.


Brand, websites and software

Two rounds of revision included. You keep the source files.

Brand

Identity systems, not logo files. Mark, lockups, colour with measured contrast, typography, templates, and guidelines a printer can work from.

3 to 6 weeks. Vector masters and source handed over.

Websites

Sites that survive being checked before you are shortlisted. Clean URLs, structured data, guarded forms, an enquiry log, and hosting set up properly.

4 to 8 weeks. Source and documentation. Optional care plan.

Software

Systems for the process nothing off the shelf fits. Built in stages with review points, so nothing goes live without a way back.

Staged. Source code is yours. Support agreed before the first release.

Start a brand or website project


IT equipment, installed and maintained

Specified, supplied, installed and kept running. Authorised distribution, manufacturer's warranty.

Laptops and desktops

Business class machines for staff and labs. Workstations and all in ones.

Servers and storage

On premises compute and storage, specified against the workload. Rack, tower, NAS, backup.

Networking

Switching, routing, wireless, and the structured cabling behind it.

Printing and scanning

Departmental and production devices, plus consumables.

Power and protection

UPS, stabilisers, rack power. The part most quotes leave out, and the reason kit fails early.

Peripherals and licensing

Displays, accessories, operating systems and productivity software.

We do not hold stock.

Equipment is ordered against a confirmed purchase order. The quote reflects real availability and a real lead time rather than a guess.

We do not offer credit.

Payment terms are agreed in writing before an order is placed. That keeps the price honest for everybody.

Request a quote


Consulting

Assessment, roadmap and procurement support. Written, not slides. 2 to 6 weeks.

Assessment

Current state, gaps, and what the risk actually is rather than what a scanner reported. Inventory, contracts, risk.

Roadmap

Costed and staged, with the trade offs named. Written for finance, not forwarded to IT for translation.

Procurement support

Specification, vendor evaluation and tender documentation. We will say when the right answer is a supplier who is not us.

Independent review

A second opinion on work already under way, before more money follows the first decision.

Book an assessment

Not sure which one you need?

Tell us the problem. We will say where it belongs.

Tell us the problem